Navigation Center Release PV9.1.0 SV100

The theme of this Major release is new functionality and bug fixes.

New Features

  • Administrators can enable due date notifications when setting report due dates to alert users when reports are due. (MP3-5524)

Fixed Issues

  • Run the Metadata Changes During Task Execution report without errors and without timing out. (MP3-6327)

  • Successfully run the Confirmation Rules Audit and Confirmation Rules - Updated reports without error when you have long confirmation rules. (MP3-7303)

  • When running the Dashboard Maintenance Audit - Updated report, dates outside the range of the date filter are not included in the results. (MP3-6398)

  • The FX Rates Lock/Unlock Audit Report runs successfully when using OneStream Modern Browser Experience. (MP3-6267)

Deprecation

  • Narrative Reporting was removed from Navigation Center and can be used as a standalone solution. (MP3-7499)

Upgrade Information

  • This release requires a minimum 9.1 Platform release.

  • If you are actively using Narrative Reporting in OneStream Navigation Center, OneStream recommends installing the standalone Narrative Reporting solution before upgrading to this version of Navigation Center. This ensures your data and books move to Narrative Reporting.

Documentation

  • The Navigation Center Guide was updated to reflect the removal of Narrative Reporting.

Compatibility

  • Minimum Platform Version 9.1.0 is required.

Contact Support

Contact OneStream Support by registering at:

Support - OneStream Software